Quantcast
Viewing all articles
Browse latest Browse all 10473

Re: Meas. Doc for Meas. Point to start Performance based Plans

Pete,

As I mentioned in my post, it is specified in SAP that a single measurement doc is sufficient to start the maint plan with annual estimate maintain. I wanted to know having more than one meas. doc will have  a better and realistic scheduling of maint calls. Thanks for the info.

Having maintained few meas. doc and other necessary objects, like Plans, TL etc. I have started few of my plans with last performed maint reading as start reading,100% call horizon and 365 days scheduling period. The IP10 has started the maint plan and scheduled few calls for 365 days. Now I am confused whether I have to create a background job with IP30 for every 365 days scheduling period OR the meas. doc updated over time will take care of future calls without running IP30.

Referred few threads, but not satisfactory answer.

 

Advance Thanks...

Murad


Viewing all articles
Browse latest Browse all 10473

Trending Articles