Hello BW expert,
I could not change a existing Bex query. It is always tied to a released transport.
I have tested I can create a new BEx query and transport it to QA without errors.
The issue is when I opened an existing query, it has a error.
Bex transport request xxxxx is not available or not suitable.
double click the errors, below is the details.
No request has been set up as the standard transport request for BEx objects.
The (set up) request 'DB2K901272' (for the package '' ) has already been released.
The (set up) request 'DB2K901272' (for the package '' ) is not of the type 'transportable change request'.
I have released transport 901272 before opening the query, I don’t know why this query is still tied to it.
I tried to create a new BEx transport (DB2K901277) and opened the query again, but an error is still there.
Third, I tried to collect all query elements for the query in the transport connection, and put them in a standard transport, then I opened the query, but it is still tied to the same released transport.
I never see an error like this before. Is there something we could change in the setting so the query is always in changeable mode?
Thanks in advance!
Jun