Boiler has been defined as Equipment. It got some breakdown which causes low in temperature.
So while creating Breakdown Notification, reporting person will create Measurement document for that temperature (which has been created as Measuring Point for the equipment Boiler)
Once it got rectified, maintenance technician will create another measurement document for the temperature while doing Actual time confirmation.
Explanation of possibility of Measuring point as PRT for maintenance operation: by maintaining master
characteristic in QM created that references the general characteristic which is assigned to the measuring point of Test Equipment.kindly provide your valuable input for the same.
What exactly you trying to convey here?? Also use normal font for the replies.